ENERGY PROJECTS
Location: Clark County, NV
Completion: Summer 2007
Estimated Construction Cost: $300 Million
Two 500kv transmission lines with a construction cost of $300 million dollars. Aerial control, centerline design topographic work, construction staking of 370 lattice towers, boundary retracement from BLM/USGLO plats and field notes to determine route alignment and easements for 80 miles of corridor.
Location: Boulder City, NV
Completion: June 2007
Estimated Construction Cost: $266 Million
The 64MW Nevada Solar One concentrated solar power plant went online in the USA June 2007. With 400 acres of solar concentrators, Nevada Solar One has become the third biggest solar thermal power plant in the world.
Location: Las Vegas, NV
Completion: Summer 2010
Estimated Construction Cost: $70 Million
The project consisted of one (1) mile of two (2) double circuit duct banks, eight (8) transmission vaults, 12 each open air and GIS terminations and 36 splices all to be completed under a tight performance schedule. The Sinatra project embodied all of Wilson’s underground transmission capabilities in that it combined not only cable installation and civil construction but splicing of open air terminations on steel poles as well as GIS terminations in a substation.
Location: Searchlight, NV
Completion: December 2009
20-megawatt (MW) DC solar photovoltaic (PV) power plant that will be constructed near Searchlight, Nevada, 55 miles south of Las Vegas. Provided boundary and topographical survey for 212 acre property in Searchlight, NV. The parcel consisted of 14 mining claims.
Location: Lancaster, CA
Completion: February 2011
40-megawatt (MW) DC solar photovoltaic (PV) power plant that will be constructed near Lancaster, CA Provided boundary and topographical survey for 320 acre property.
Location: Near Fresno, CA
Completion: June 2011
40-megawatt (MW) DC solar photovoltaic (PV) power plant that will be constructed near Lancaster, CA Provided boundary and topographical survey for 281 acre property.
Location: Mojave, CA
Completion: June 2011
40-megawatt (MW) DC solar photovoltaic (PV) power plant that will be constructed near Mojave, CA Provided boundary and topographical survey for 277 acre property.
Location: Mojave, CA
Completion: June 2011
50-megawatt (MW) DC solar photovoltaic (PV) power plant that will be constructed near Mojave, CA Provided boundary and topographical survey for 400 acre property.
Location: Bakersfield, CA
Completion: June 2011
80-megawatt (MW) DC solar photovoltaic (PV) power plant that will be constructed near Bakerfield, CA Provided boundary and topographical survey for 595 acre property.
Location: Mojave, CA
Completion: June 2011
80-megawatt (MW) DC solar photovoltaic (PV) power plant that will be constructed near Mojave, CA Provided boundary and topographical survey for 654 acre property.
Location: Landcaster, CA
Completion: June 2011
40-megawatt (MW) DC solar photovoltaic (PV) power plant that will be constructed near Landcaster CA Provided boundary and topographical survey for 298 acre property.
Location: Buckeye, AZ
Completion: September 2011
60-megawatt (MW) DC solar photovoltaic (PV) power plant that will be constructed near Buckeye, AZ Provided boundary and topographical survey for 480 acre property.
Location: Prescott, AZ
Completion: September 2011
80-megawatt (MW) DC solar photovoltaic (PV) power plant that will be constructed near Prescott, AZ Provided boundary and topographical survey for 640 acre property.
Location: Calexico, CA
Completion: August 2011
60-megawatt (MW) DC solar photovoltaic (PV) power plant that will be constructed near Calexico, CA Provided boundary and topographical survey for 320 acre property.