Construction Projects





Project: Ash at the Curve
Location: Las Vegas, NV
Completed: 2025
Buildings Staking Includes:
- Exterior Gridlines or Corners
- Finish Floor Certification
Offsite Staking includes:
- Verify Control/ Sawcut limits
- Final Curb/ Edge of Pavement
- Earth Swales
- Sidewalk Drains
- Cross Gutters
Onsite Trenching Includes:
- Underslab Plumbing
- All Wet Utilities
- Site Lighting conduit
- Pylon Sign and Conduit trench from the building
- Pump House
- EV Parking area conduits trench
Onsite Staking Includes:
- Verify Control
- Rough Grade Parking
- Red Head Pad
- Blue Top Pad
- Sewer Mains at M/H’s, A.P.s
- Water Lines at “T’s”, A.P.’s
- Fire Hydrants
- Red Head Truck Docks
- Blue Top Truck Docks
- Onsite Final Curb
- Trash Enclosures
- Blue Top Handicap Parking
- Rip/Rap & Earth Swales
- Retaining Walls at AP’s & Ends
- Ramp Walls
- Valley Gutter
- Site Light Pole Bases
- Streetlights and Sewer Asbuilts



Project: Southern Hill Church
Location: Las Vegas, NV
Completed: 2025
Building Staking Includes:
- Rough Grade Building Pad
- Blue Top Building Pad
- Gridlines/ Final Building Corners
- Finished Floor Certification
Offsite Staking Includes:
- Verify Control/Saw cuts
- Blue Top Street
- Water Lines at P.O.C
- Sewer Mains at P.O.C
- Final Curb/ Edge of Pavement
- Cross Gutters
- Verify Control
- Rough Grade Parking Lot
- Blue Top Parking Lot
- Sewer Mains at M/H’s, A.P.’s
- Water Lines at ‘T’s”, A.P.’s
- Fire Hydrants
- Onsite Final Curb
- Trash Enclosures
- Blue Top Handicap Parking
- Relocation of Existing Transformer
- Valley Gutter
- Site Light Pole Bases



Project: Badura Avenue & Cimmaron Road
Location: Las Vegas, NV
Completed: 2025
Building Staking:
- Rough Grade Pads
- Redhead Pads
- Blue Top Pads
- Gridlines / Final Building Corners
- Finish Floor Elevation Certifications
Offsite Staking includes:
- Verify Control / Sawcut limits
- Rough Grade Street
- Red Head Street
- Blue Top Street
- Water Lines P.O.C.’s
- Sewer Mains at M/H’s, A.P.’s
- Storm Drain at M/H’s
- Final Curb / Edge Of Pavement
- Sidewalk Drains
- Cross Gutters
Onsite Staking:
- Control Survey
- Rough Grade Parking Lot
- Blue Top Parking Lot
- Sewer Mains at M/H’s, A.P.’s
- Water Lines at “T’s”, A.P.’s
- Fire Hydrants
- Onsite Final Curb
- Trash Enclosures
- Blue Top Handicap Parking
- Rip/Rap & Earth Swales
- Valley Gutter
- Site Light Pole Bases
- Redhead Loading Docks
- Blue Top Loading Docks
- Retaining Walls A.P.’s & Ends
- Storm Drain at M/H’s




Project: Atwell Suites
Location: Henderson, NV
Completed: 2025
Building Staking:
- Rough Grade Building Pad
- Blue Top Building Pad
- Gridlines
- Finish Floor Certification
Offsite Staking:
- Verify Control/Sawcut Limits
- Water P.O.C.’s
- Sewer P.O.C.’s
- Storm Drain Mains at M/H’s
Onsite Staking:
- Verify Control
- Rough Grade Parking Lot
- Blue Top Parking Lot
- Sewer Mains at M/H’s, A.P.’s
- Fire Hydrants
- Onsite Final Curb
- Trash Enclosures
- Blue Top Handicap Parking
- Earth Swales
- 8′ Valley Gutter at Driveway
- Site Light Poles
- Retaining Wall Ends & A.P.’s
- Storm Drains at M/H’s, A.P.’s




Project: Hualapai & Patrick
Location: Las Vegas, NV
Completed: 2025
Building Staking:
- Bulding Layout
- Finish Floor Certification
Onsite Staking:
- Verify Control
- Rough Grade Parking
- Blue Top Pad
- Sewer Mains at M/H’s, A.P.’s
- Water Lines at T’s, A.P.’s
- Fire Hydrants
- Onsite Final Curb
- Trash Enclosures
- Blue Top Handicap Parking
- Retaining Walls, AP’s & Ends
- Valley Gutter
Offsite Staking:
- Verify Control/Sawcut limits
- Rough Grade Street
- Blue Top Street
- Water Lines at “T’s”, A.P.’s
- Storm Drain, MH’s
- Sewer Mains at M/H’s, A.P.’s
- Final Curb/Edge of Pavement
- Sidewalk Drains
- Cross Gutters




Project: Conestoga Way
Location: Henderson, NV
Completed: 2025
Building Staking:
- Building Corners
- Building Grid Lines
- Finish Floor Elevation Certification
Onsite Staking:
- Verify Control
- Rough Grade Parking
- Red Head Pads
- Blue Top Pads
- Sewer Mains at M/H’s, A.P.’s
- Water Lines at “T’s”, A.P.’s
- Fire Hydrants
- Valley Gutters
- Truck Dock Walls, Ends
- Earth Swales
- Onsite Final Curb/Edge of Pavement
- Trash Enclosures
- Blue Top Handicap Parking
- Red Top Truck Docks
- Blue Top Truck Docks
- Sidewalk Drains
- Storm Drain, M/H’s & Inlets
- Cross Gutters
- Site Light Pole Bases
- Walls at AP’s & Ends



